101 2023 - 2023 PREV. MAINT. TRAFO CONTROL MCC,PM5 Gresik
102 2023 - 2023 PREV. MAINT. STARTING REACTOR, PM5 Gresik
103 2023 - 2023 ALIGNMENT MOTOR,LAROS,PM5 Gresik
104 2023 - 2023 Replacement Disconecting Switch (DS) for Feeder PM1,2,3 at Substation 1 Gresik
105 2023 - 2023 Supply Breaker & Timer Switch for MV Motor A1.01.Hicon Pulper Gresik
106 2023 - 2023 Supply Vacuum Contactor, Siemens for Area New DIP Gresik
107 2023 - 2023 Replacement Relay Protection for MV Motor Krimar Area NEW DIP Gresik
108 2023 - 2023 Inspection VSD and Elmot for BC3 Banjarmasin
109 2023 - 2023 Island Mode Gas Turbine Gresik
110 2023 - 2023 Dismantling VCB & Installation LCS Box for Feeder T1 Gresik
111 2023 - 2023 Installation Automation Level Pit PM2,3 Gresik
112 2023 - 2023 PM2,3 Fiber Recovery Project - 400V MCC Gresik
113 2023 - 2023 Automation for PM23 Fiber Recovery Gresik
114 2023 - 2023 Installation Cover Cable Tray Ladder WHB Gresik
115 2023 - 2023 Inspection Switchgear PM1, DIP2, Powerplant Gresik
116 2023 - 2023 Replacement Power Meter for Panel Incoming Non Drive & Panel TR4 Area PM1 Gresik
117 2022 - 2022 Inspection VCB on Panel F29 Probolinggo
118 2022 - 2022 Supply & Installation Water Recycle Project Area DAF1,DAF2, to PM1, DAF2 to PM2, DAF2 to PM3 Gresik
119 2022 - 2022 Replacement Protection Relay MV Switchgear of SP1 Gresik
120 2022 - 2022 Replacement Protection Relay MV Switchgear of PM1 Gresik
121 2022 - 2022 Relay Protection Replacement and Retrofit Wiring Control Box Gresik
122 2022 - 2022 Corrective Transformer T1 Area PM1 Gresik
123 2022 - 2022 Replacement Protection Relay MV Switchgear of SP2 Gresik
124 2022 - 2022 Maintenance, Troubleshoot, Corrective & Installation Electrical System Madura
125 2022 - 2022 Replacement Protection Relay MV Switchgear of SP2 Gresik