51
|
2023 - 2023 |
Inspection SWG T8 & SWG T9 SP1 |
Gresik |
52
|
2023 - 2023 |
Inspection T8 & T9 SP1 |
Gresik |
53
|
2023 - 2023 |
Purifying T1, T2, T3, T4 PM1 |
Gresik |
54
|
2023 - 2023 |
Recovery Electrical Panel Switchgear Motor MV |
Gresik |
55
|
2023 - 2023 |
Purifying T9 Workshop |
Gresik |
56
|
2023 - 2023 |
Replacement Component All Control Desk at Area PM2 |
Gresik |
57
|
2023 - 2023 |
Replacement Component All Control Desk at Area PM3 |
Gresik |
58
|
2023 - 2023 |
Preventive Maintenance Transformer Control Drive TR-17, 30 kVA at Area PM3 |
Gresik |
59
|
2023 - 2023 |
Inspection INC Swg T8&T9 SP1 |
Gresik |
60
|
2023 - 2023 |
Additional Oil OCB T9 Workshop |
Gresik |
61
|
2023 - 2023 |
ALIGNMENT MOTOR AREA PM3,SP23,DIP |
Gresik |
62
|
2023 - 2023 |
Purifying T22 & T23 Area SP23 |
Gresik |
63
|
2023 - 2023 |
Replacement Oil Seal T27 Old DIP |
Gresik |
64
|
2023 - 2023 |
Replacement Oil Seal T3 New DIP |
Gresik |
65
|
2023 - 2023 |
Check Contactor Control 110 VDC at Area PM3 |
Gresik |
66
|
2023 - 2023 |
Check & Insulation Test VT at Area PM3 for MV SWG T17 |
Gresik |
67
|
2023 - 2023 |
Replacement Push Button ON/OFF Control VCB T21 PM2 |
Gresik |
68
|
2023 - 2023 |
Check & Insulation Test Vacuum Circuit Contactor (VCC) at Area PM3 |
Gresik |
69
|
2023 - 2023 |
Repair Termination Cable MV Motor with Rubber Scotch At Area PM3 |
Gresik |
70
|
2023 - 2023 |
TERMINATION MV CABLE SP23 |
Gresik |
71
|
2023 - 2023 |
Supply Manpower |
Gresik |
72
|
2023 - 2023 |
Corrective Power 110 VDC for Control Substation 1 |
Gresik |
73
|
2023 - 2023 |
Replacement & Modification Busbar VCB for Feeder DIP at Substation 1 |
Gresik |
74
|
2023 - 2023 |
Lift Up Cable Ladder at Substation 2 |
Gresik |
75
|
2023 - 2023 |
Repair Termination Kit & Splicing Kit MV Cable 400 mm2 at New DIP |
Gresik |