# Duration Project Name Location
26 2023 - 2023 Purifying Transformer DOHK Area Power Plant Gresik
27 2023 - 2023 Calibration of Instrument WHB Gresik
28 2023 - 2023 Supply Fresh Water 40.000 Liter Gresik
29 2023 - 2023 Calibration of Instrument Coal Boiler 1 & 2 Gresik
30 2023 - 2023 Purifying Transformer TOHK1 & TOHK2 Area Power Plant Gresik
31 2023 - 2023 Supply & Installation PC Engineering Work Station at Anaerob Gresik
32 2023 - 2023 Corrective Transformer T24 & T25 Area SP23 Gresik
33 2023 - 2023 SVC DCS Program Feeding Conveyor WHB Gresik
34 2023 - 2023 Purifying Transformer T1, T2, T3, T4 Area PM1 Gresik
35 2023 - 2023 Battery 12VDC 200AH Gresik
36 2023 - 2023 Supply Terminal Viking UKK5N Gresik
37 2023 - 2023 Inspection SWG INC, SWG T32, SWG T33, SWG T34 Gresik
38 2023 - 2023 Inspection T32, T33, T34 Gresik
39 2023 - 2023 Insulation Test VT PM5, Clean & Cover MV Cable Panel PM5 Gresik
40 2023 - 2023 Purifying T35, PM5 Gresik
41 2023 - 2023 Fresh Water Gresik
42 2023 - 2023 Emergency Lamp Gresik
43 2023 - 2023 Rent Mix Flow Volute Pump Gresik
44 2023 - 2023 Rent Portable Water Pump Gresik
45 2023 - 2023 Rent Megger Gresik
46 2023 - 2023 Supply Battery VRLA 12 VDC 100 Ah Gresik
47 2023 - 2023 Corrective & Purifying Transformer T25 Area SP23 Gresik
48 2023 - 2023 Corrective & Purifying Transformer T24 Area SP23 Gresik
49 2023 - 2023 Recovery Electrical Power Transformer (Total Update Inspection 20 set Transformer) Gresik
50 2023 - 2023 Recovery Electrical Panel Switchgear Gresik
Contact Us