Our Journey

A Journey of Growth and Expertise

# Duration Project Name Location
226 2021 - 2021 Service & Repair MV MCC Vacum 2623 PM1 Gresik
227 2021 - 2021 Belt Sway Switch Gresik
228 2021 - 2021 Oxygen Analyzer Transmitter Gresik
229 2021 - 2021 UPS Sin 3100 Gresik
230 2021 - 2021 Sirine Horn PM3 Gresik
231 2021 - 2021 Supply & Installation Exhaust Fan & Termination Power Building of Incinerator Gresik
232 2021 - 2021 Supply Transmitter Ultrasonic Level Gresik
233 2020 - 2020 Installation and Alignment Dust Suppression Surabaya
234 2020 - 2020 Installation and Commissioning Relay Protection VAMP 40 - MV Switchgear 70 Kv Gresik
235 2020 - 2020 Supply, Installation and Test VFD Cutting Machine of Petrokimia. Gresik
236 2020 - 2020 Repair The MV Cable Gresik
237 2020 - 2020 Inspection, Test & Maintenance MV Switchgear of Power Plant, Subs 1 + Subs 2 Gresik
238 2020 - 2020 Supply of Overcurrent & Earth Fault Protection Relay Gresik
239 2020 - 2020 Supply of Panel MCC Inverter & Inverter (SES) Gresik
240 2020 - 2020 Termination & Hi-pot Test for MV Motor Cable Gresik
241 2020 - 2020 Supply Termination Kit, Installation & Hi-pot Test for MV Cable Gresik
242 2020 - 2020 Supply Grounding Box Include Busbar Connection Gresik
243 2020 - 2020 Inspection & Maintenance LV Switchgear & Cable Power PM3 (ACB) Gresik
244 2020 - 2020 Preventive Maintenance Service of Transformer (Kontrak Tahunan) Gresik
245 2020 - 2020 Installation and Commissioning Test Battery Charger and Battery 110 VDC Gresik
246 2020 - 2020 Maintenance & Repair Electrical System PM3 Gresik
247 2020 - 2020 Service, Maintenance & Oil Purifiying Transformer PM3 & Drum Pulper Gresik
248 2020 - 2020 Site Acceptance Test for MV Panel Siemens - Simoprime A4 at PG Asembagus Sidoarjo
249 2020 - 2020 Installation Panel Simoprime in PP Mahalayati, Aceh Jakarta
250 2020 - 2020 Thermoscan Inspection for Electric Panel PM2 (Drive Motor Panel, LV & MV Panel SP and PM) Gresik
Contact Us