Our Journey

A Journey of Growth and Expertise

# Duration Project Name Location
76 2023 - 2023 Preventive Maintenance Starting Reactor at Area PM3 Gresik
77 2023 - 2023 Replacement Contactor 110 VDC for Control VCB T23 at Area SP23 Gresik
78 2023 - 2023 Repair Termination Kit MV Cable 150 mm2 Incoming Old DIP Gresik
79 2023 - 2023 Preventive Maintenance Starting Reactor at Area Old DIP Gresik
80 2023 - 2023 Preventive Maintenance Starting Reactor at Area New DIP Gresik
81 2023 - 2023 REPLACE VCB SWG INCOMING T23,SP23 Gresik
82 2023 - 2023 REPLACE VCB FOR FEEDER DIP-SS1 Gresik
83 2023 - 2023 REPLACE NEW VT SWG INCOMING DIP Gresik
84 2023 - 2023 REPLACE VCB FOR FEEDER T2-SS1 Gresik
85 2023 - 2023 REPLACE NEW CT FOR T9-WS.EE Gresik
86 2023 - 2023 Repair Buchholz Relay T9 Area Workshop Electric Gresik
87 2023 - 2023 Repair Buchholz Relay T18 Area PM2 Gresik
88 2023 - 2023 ALIGNMENT MOTOR, NEW DIP Gresik
89 2023 - 2023 Repair Splicing Cable existing with Rubber Scotch At WWTP Gresik
90 2023 - 2023 Replacement VCB & Relay Protection for Feeder PM1,2,3 at Substation 1 Gresik
91 2023 - 2023 Re-Wiring Alarm Buchholz Outgoing T9 Gresik
92 2023 - 2023 Recondition Reactor M31 Area PM3 Gresik
93 2023 - 2023 Recondition Transformer Control MV Panel T17 Area PM3 Gresik
94 2023 - 2023 Recondition Reactor M67 Area Old DIP Gresik
95 2023 - 2023 Recondition Reactor M. Krima Area New DIP Gresik
96 2023 - 2023 Troubleshooting Panel 3.3 kV at Workshop Electric Gresik
97 2023 - 2023 Replacement OCB & New VT for Incoming 3.3 kV Workshop Electric Gresik
98 2023 - 2023 Terminal Viking Weidmuller, Terminal Block 4P, Starter Module 3 kW MCC Chemical Gresik
99 2023 - 2023 Install Cable PLC Drive PM5 Gresik
100 2023 - 2023 Manpower EE dan ME PM5 Gresik
Contact Us