# Duration Project Name Location
101 2023 - 2023 PREV. MAINT. TRAFO CONTROL MCC,PM5 Gresik
102 2023 - 2023 PREV. MAINT. STARTING REACTOR, PM5 Gresik
103 2023 - 2023 ALIGNMENT MOTOR,LAROS,PM5 Gresik
104 2023 - 2023 Replacement Disconecting Switch (DS) for Feeder PM1,2,3 at Substation 1 Gresik
105 2023 - 2023 Supply Breaker & Timer Switch for MV Motor A1.01.Hicon Pulper Gresik
106 2023 - 2023 Supply Vacuum Contactor, Siemens for Area New DIP Gresik
107 2023 - 2023 Replacement Relay Protection for MV Motor Krimar Area NEW DIP Gresik
108 2023 - 2023 Inspection VSD and Elmot for BC3 Banjarmasin
109 2023 - 2023 Island Mode Gas Turbine Gresik
110 2023 - 2023 Dismantling VCB & Installation LCS Box for Feeder T1 Gresik
111 2023 - 2023 Installation Automation Level Pit PM2,3 Gresik
112 2023 - 2023 PM2,3 Fiber Recovery Project - 400V MCC Gresik
113 2023 - 2023 Automation for PM23 Fiber Recovery Gresik
114 2023 - 2023 Installation Cover Cable Tray Ladder WHB Gresik
115 2023 - 2023 Inspection Switchgear PM1, DIP2, Powerplant Gresik
116 2023 - 2023 Replacement Power Meter for Panel Incoming Non Drive & Panel TR4 Area PM1 Gresik