# | Duration | Project Name | Location |
---|---|---|---|
51 | 2020 - 2020 | Supply Relay Protection Siemens | Gresik |
52 | 2020 - 2020 | Inspection and Repair MV Cable | Gresik |
53 | 2020 - 2020 | Dismantling, Installation New Tray, Re-Arrangement Cable Installation Of Panel MCC at WWTP | Gresik |
54 | 2020 - 2020 | Installation Cable Tray DAF 1 Area | Gresik |
55 | 2020 - 2020 | Repair Line 1 & 2 Riser Panel of Subs 1 because Short Circuit Fault | Gresik |
56 | 2020 - 2020 | Installation, Modification Panel Feeder & Power Cable for Compressor PM1 | Gresik |
57 | 2020 - 2020 | Dismantling & Re‐Installation MV Panel L3 from Sub 1 to Sub 2 | Gresik |
58 | 2020 - 2020 | Dismantling, Move & Re-Installation Transformer L3 10 MVA from Sub 1 to Sub 2 | Gresik |
59 | 2020 - 2020 | Enc-Moving Panel and Retrofit Panel | Gresik |
60 | 2020 - 2020 | Close the Hole of MV, LV & MCC panel | Gresik |
61 | 2020 - 2020 | Repair MV Cable Sub2-DIP | Gresik |
62 | 2020 - 2020 | Supply Bucholz Relay | Gresik |
63 | 2020 - 2020 | Inspection PLC for Area PMT | Gresik |