26 | 2023 - 2023 | Purifying Transformer DOHK Area Power Plant | Gresik |
27 | 2023 - 2023 | Calibration of Instrument WHB | Gresik |
28 | 2023 - 2023 | Supply Fresh Water 40.000 Liter | Gresik |
29 | 2023 - 2023 | Calibration of Instrument Coal Boiler 1 & 2 | Gresik |
30 | 2023 - 2023 | Purifying Transformer TOHK1 & TOHK2 Area Power Plant | Gresik |
31 | 2023 - 2023 | Supply & Installation PC Engineering Work Station at Anaerob | Gresik |
32 | 2023 - 2023 | Corrective Transformer T24 & T25 Area SP23 | Gresik |
33 | 2023 - 2023 | SVC DCS Program Feeding Conveyor WHB | Gresik |
34 | 2023 - 2023 | Purifying Transformer T1, T2, T3, T4 Area PM1 | Gresik |
35 | 2023 - 2023 | Battery 12VDC 200AH | Gresik |
36 | 2023 - 2023 | Supply Terminal Viking UKK5N | Gresik |
37 | 2023 - 2023 | Inspection SWG INC, SWG T32, SWG T33, SWG T34 | Gresik |
38 | 2023 - 2023 | Inspection T32, T33, T34 | Gresik |
39 | 2023 - 2023 | Insulation Test VT PM5, Clean & Cover MV Cable Panel PM5 | Gresik |
40 | 2023 - 2023 | Purifying T35, PM5 | Gresik |
41 | 2023 - 2023 | Fresh Water | Gresik |
42 | 2023 - 2023 | Emergency Lamp | Gresik |
43 | 2023 - 2023 | Rent Mix Flow Volute Pump | Gresik |
44 | 2023 - 2023 | Rent Portable Water Pump | Gresik |
45 | 2023 - 2023 | Rent Megger | Gresik |
46 | 2023 - 2023 | Supply Battery VRLA 12 VDC 100 Ah | Gresik |
47 | 2023 - 2023 | Corrective & Purifying Transformer T25 Area SP23 | Gresik |
48 | 2023 - 2023 | Corrective & Purifying Transformer T24 Area SP23 | Gresik |
49 | 2023 - 2023 | Recovery Electrical Power Transformer (Total Update Inspection 20 set Transformer) | Gresik |
50 | 2023 - 2023 | Recovery Electrical Panel Switchgear | Gresik |