Our Journey
A Journey of Growth and Expertise
| # | Duration | Project Name | Location |
|---|---|---|---|
| 26 | 2023 - 2023 | Purifying Transformer DOHK Area Power Plant | Gresik |
| 27 | 2023 - 2023 | Calibration of Instrument WHB | Gresik |
| 28 | 2023 - 2023 | Supply Fresh Water 40.000 Liter | Gresik |
| 29 | 2023 - 2023 | Calibration of Instrument Coal Boiler 1 & 2 | Gresik |
| 30 | 2023 - 2023 | Purifying Transformer TOHK1 & TOHK2 Area Power Plant | Gresik |
| 31 | 2023 - 2023 | Supply & Installation PC Engineering Work Station at Anaerob | Gresik |
| 32 | 2023 - 2023 | Corrective Transformer T24 & T25 Area SP23 | Gresik |
| 33 | 2023 - 2023 | SVC DCS Program Feeding Conveyor WHB | Gresik |
| 34 | 2023 - 2023 | Purifying Transformer T1, T2, T3, T4 Area PM1 | Gresik |
| 35 | 2023 - 2023 | Battery 12VDC 200AH | Gresik |
| 36 | 2023 - 2023 | Supply Terminal Viking UKK5N | Gresik |
| 37 | 2023 - 2023 | Inspection SWG INC, SWG T32, SWG T33, SWG T34 | Gresik |
| 38 | 2023 - 2023 | Inspection T32, T33, T34 | Gresik |
| 39 | 2023 - 2023 | Insulation Test VT PM5, Clean & Cover MV Cable Panel PM5 | Gresik |
| 40 | 2023 - 2023 | Purifying T35, PM5 | Gresik |
| 41 | 2023 - 2023 | Fresh Water | Gresik |
| 42 | 2023 - 2023 | Emergency Lamp | Gresik |
| 43 | 2023 - 2023 | Rent Mix Flow Volute Pump | Gresik |
| 44 | 2023 - 2023 | Rent Portable Water Pump | Gresik |
| 45 | 2023 - 2023 | Rent Megger | Gresik |
| 46 | 2023 - 2023 | Supply Battery VRLA 12 VDC 100 Ah | Gresik |
| 47 | 2023 - 2023 | Corrective & Purifying Transformer T25 Area SP23 | Gresik |
| 48 | 2023 - 2023 | Corrective & Purifying Transformer T24 Area SP23 | Gresik |
| 49 | 2023 - 2023 | Recovery Electrical Power Transformer (Total Update Inspection 20 set Transformer) | Gresik |
| 50 | 2023 - 2023 | Recovery Electrical Panel Switchgear | Gresik |