26 2022 - 2022 MV Connection Network from Switchyard to Substation 1 Gresik
27 2022 - 2022 Corrective Programmable Logic Controller for OKI Pulp & Paper Mills Palembang
28 2022 - 2022 Repair MV Cable & MV Contactors for Gas Compressor Power Plant Gresik
29 2022 - 2022 Increase Oil Quality & Purifying Transformer 10 MVA, Switchyard Gresik
30 2022 - 2022 Supply & Installation Flow Meter of Water Treatment Gresik
31 2022 - 2022 Installation Holder Fuse MV Switchgear Drive PM3 Gresik
32 2022 - 2022 Supply Transmitter Ultrasonic Level Gresik
33 2022 - 2022 Corrective Transformer T9 Area SP1 Gresik
34 2022 - 2022 Supply & Installation Electrical EQ Pond 75 kW of WWTP Gresik
35 2022 - 2022 Material PLC SP5 Gresik
36 2022 - 2022 Inspection MV Drive Robicon & MV Switchgear Feeder Lamongan
37 2022 - 2022 Supply & Installation VCB for Feeder 6,3 kV from Mainsubs Gresik
38 2022 - 2022 Supply & Installation VCB for Incoming 6,3 kV at Substation 1 Gresik
39 2022 - 2022 Modifcation Program Interlocking PLC Yokogawa for WHB Gresik
40 2022 - 2022 Vibration Analysis Survey at Rig Tasha Samarinda
41 2022 - 2022 Installation of SP5 Gresik
42 2022 - 2022 Supply and Installation Compressor Area SP3 Gresik
43 2022 - 2022 Supply Electric Hoist 2 Ton x 10 m with Trolley Semarang
44 2022 - 2022 Training Delta V Automation Systems Semarang
45 2022 - 2022 POWER FACTOR IMPROVMENT AT MV SYSTEM SUBSTATION 1 Gresik
46 2022 - 2022 Corrective Transformer T5 Area PM1, T6 PM1, T7 PM1, T10 PM1, FINISHING PM1 Gresik
47 2022 - 2022 Repair ACB, Schneider NW10 H1 Samarinda
48 2022 - 2022 Corrective Transformer T18 PM2, T29 PM3, T25 SP2, T24 SP2, T26 DIP Gresik
49 2022 - 2022 Supply Rotary Lamp Gresik
50 2022 - 2022 Supply Level Radar Sensor Semarang