26
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area HRSG |
Gresik |
27
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area Demin |
Gresik |
28
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area Gas Turbine |
Gresik |
29
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area Coal Boiler |
Gresik |
30
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area PM1 |
Gresik |
31
|
2020 - 2020 |
Thermoscan Inspection for Electric Panel Area SP1 |
Gresik |
32
|
2020 - 2020 |
Inspection & Maintenance for MV Motor Panel of DDR SP3 |
Gresik |
33
|
2020 - 2020 |
Installation of Ladder & LV Cable for WWTP Feeder |
Gresik |
34
|
2020 - 2020 |
Supply and Modification Panel MCC (Additional Component MCC Panel SP PM1) |
Gresik |
35
|
2020 - 2020 |
SLO & Electrical Installation on Switchyard 30 MVA & Sub-1 |
Gresik |
36
|
2020 - 2020 |
Service & Maintenance ACB 10 unit |
Gresik |
37
|
2020 - 2020 |
Service & Maintenance ACB 19 unit |
Gresik |
38
|
2020 - 2020 |
Acceptance Test MV Switchgear |
Probolinggo |
39
|
2020 - 2020 |
Supply and Installation Grounding WWTP |
Gresik |
40
|
2020 - 2020 |
Switchgear Service Contract |
Gresik |
41
|
2020 - 2020 |
Supply Skill Man Power of Electrical & Instrument for Maintenance |
Gresik |
42
|
2020 - 2020 |
FAT ACB Siemens 3 WL |
Surabaya |
43
|
2020 - 2020 |
MCC Inverter 55 kW for Motor 1M-7037 Air Turn |
Gresik |
44
|
2020 - 2020 |
Retrofit MV Switchgear Feeder for Palletizer |
Gresik |
45
|
2020 - 2020 |
Checking and Commissioning MCC Panel Anaerob Plant |
Gresik |
46
|
2020 - 2020 |
Investigation and Maintenance Power Cable Substation 1 Line 2 (Ins;Mainsubtation Death End Sub 1) |
Gresik |
47
|
2020 - 2020 |
Assesment and Power Study Analysis |
Gresik |
48
|
2020 - 2020 |
Electrical & Instrument Installation of Pellet Plastic Project |
Gresik |
49
|
2020 - 2020 |
Supply METSEPM5560 PM5560 Power meter w 1 mod2eth |
Banyuwangi |
50
|
2020 - 2020 |
Supply METSEPM5560 PM5560 Power meter w 1 mod2eth |
Banyuwangi |